All Reports

TVA’s Solar Power Purchase Agreements

Report Number
2024-17482

The Tennessee Valley Authority (TVA) has set a goal of increasing its solar capacity to 10,000 megawatts by 2035.  Due to issues in the solar industry resulting in project delays and price increases, we performed an audit of TVA’s solar power purchase agreements (PPAs).  Our audit objectives were to determine (1) how supply chain disruptions, construction and in‑service delays, contract restructuring, and other factors have affected TVA’s solar PPAs and (2) if any restructured PPAs are still in TVA’s financial interest.

Audit

Cybersecurity Vulnerability Management

Report Number
2024-17508

The Office of the Inspector General performed an audit of the Tennessee Valley Authority’s (TVA) cybersecurity vulnerability management program.  Our objective was to determine if TVA is compliant with the Cybersecurity and Infrastructure Security Agency (CISA) Binding Operational Directive (BOD) 22-01, Reducing the Significant Risk of Known Exploited Vulnerabilities (KEVs), and CISA BOD 19-02, Vulnerability Remediation Requirements for Internet-Accessible Systems. 

Audit

Independent Examination of Cost Proposal for New Caledonia Gas Plant

Report Number
2024-17524

At the request of the Tennessee Valley Authority’s (TVA) Supply Chain, we examined the cost proposal submitted by a contractor for the New Caledonia Gas Plant.  Our examination objective was to determine if the cost proposal was fairly stated.  The contractor proposed a target cost estimate (TCE) of approximately $474.7 million for the construction of a potential simple cycle natural gas electricity generating plant at TVA’s New Caledonia site in Steens, Mississippi.

Audit

Burns and McDonnell Engineering - Contract No. 15388

Report Number
2024-17477

We performed an audit of the costs billed to the Tennessee Valley Authority (TVA) by Burns & McDonnell Engineering Company, Inc (B&M) under Contract No. 15388 for engineering services.

Audit

Gas Plant Overtime

Report Number
2024-17511

The Tennessee Valley Authority (TVA) currently operates 101 natural gas- and fuel oil-fired generators at 18 sites.  During 2020, we performed an evaluation of overtime worked at TVA gas plants and found a significant amount of overtime was being worked by employees at some plants.  In response to that evaluation, TVA hired additional full-time employees at some gas plants.  However, overtime worked at gas plants has continued to increase since our previous evaluation.

Inspection / Evaluation

Hydro Plant Overtime

Report Number
2024-17513

The Tennessee Valley Authority (TVA) currently operates 29 power-generating hydro plants and one pumped-storage plant.  Between June 1, 2022, and May 31, 2024, employees at TVA’s hydro plants were paid a total of $71.7 million.  Of this $71.7 million, $15.1 million (21 percent) was paid for 187,579 hours of overtime to 243 employees. 

Inspection / Evaluation

Sequoyah Nuclear Plant Vendor Selection Process

Report Number
2024-17487

The Tennessee Valley Authority (TVA) Nuclear organization has a vision to be the top nuclear fleet by the end of fiscal year 2025 and an initiative to sustain top quartile performance.  Selection of suppliers responsible for maintenance or system upgrades within TVA’s nuclear fleet can affect TVA’s ability to maintain top quartile performance and achieve TVA Nuclear’s vision.  Two departments essential for making supplier selections are each plant’s respective Site Projects group and TVA’s Supply Chain (SC) organization.  Through soliciting vend

Inspection / Evaluation

Solar Panels Purchased for Lawrence County Solar Project

Report Number
2024-17481

In June 2019, the Tennessee Valley Authority (TVA) completed an Integrated Resource Plan and recommended the expansion of solar generating capacity by up to 14,000 megawatts (MW) by 2038. According to TVA’s fiscal year 2020 Sustainability Report, TVA set a sustainability aspiration to achieve 10,000 MW of solar generation by 2035. To help achieve this goal, TVA purchased 3,000 acres to construct an estimated 200 MW solar facility in Lawrence County, Alabama.

Audit

TVA’s Analysis of the Power Supply Plan Reliability

Report Number
2023-17465

The Tennessee Valley Authority’s (TVA) Power Supply Plans (PSPs) combine optimized capacity and generation plans that balance load and power supply and provide detailed dispatch and generation forecasts used in resource decisions, budgeting, and analysis. PSPs incorporate key planning assumptions, including load and commodity forecasts, fleet characteristics, and other inputs, applying least cost planning methodology.

Inspection / Evaluation

GE Vernova International, LLC

Report Number
2024-17498

We performed an audit of costs billed to the Tennessee Valley Authority (TVA) by GE Vernova International, LLC (GEVI) for parts and services for the covered units at the Allen Combined Cycle Plant as part of a long-term service agreement under Contract No. 11930. Our audit objective was to determine if costs were billed in compliance with the contract’s terms. Our audit scope included about $48.5 million in costs billed from January 1, 2021, through March 31, 2024.

Audit