U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Https

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

All Reports

Semiannual Report – October 1, 2024 – March 31, 2025

We are pleased to present our report for the period October 1, 2024, to March 31, 2025.  In this semiannual period, our audit, evaluation, and investigative activities identified more than $75.1 million in questioned costs; funds put to better use; restitutions, recoveries, fees, and fines; and opportunities for the Tennessee Valley Authority (TVA) to improve its programs and operations.

Semiannual Report

Independent Examination of Cost Proposal for Hydro Modernization

Report Number
2025-17540

At the request of the Tennessee Valley Authority’s (TVA) Supply Chain, we examined the cost proposal submitted by a contractor for designing, fabricating, and delivering hydraulic turbine runners and components as specified by TVA.  Our examination objective was to determine if the contractor's cost proposal was fairly stated. 

Audit

Microsoft 365® Access Control

Report Number
2024-17522

The Office of the Inspector General performed an audit to determine if the Tennessee Valley Authority’s (TVA’s) corporate deployment of Microsoft 365® was configured to require and enforce the use of multi-factor authentication (MFA) for all accounts.  Our scope was limited to MFA managed through Microsoft Entra® ID.  We determined TVA has required and enforced the use of MFA for all accounts with limited exclusions for service accounts. Additionally, we reviewed a sample of service accounts and determined they were approved and documented in accordance with t

Audit

Aurora Transmission Project

Report Number
2024-17486

The Office of Inspector General determined risks to Tennessee Valley Authority resulting from lower-than-expected demand by a manufacturer was not considered and actions to address cost overruns were not fully implemented.  Specifically, the manufacturer’s monthly demand averaged approximately 10 megawatts (MWs) of the planned 160 MWs, which could impact TVA’s ability to recover the costs incurred to support the manufacturer.  In addition, analyses conducted by TVA identified causes for cost overruns and action plans were developed to mitigate the risk of cost over

Inspection / Evaluation

Independent Examination of Cost Proposal for Hydro Modernization

Report Number
2025-17539

At the request of the Tennessee Valley Authority’s (TVA) Supply Chain, we examined the cost proposal submitted by a company for designing, fabricating, and delivering hydraulic turbine runners and components as specified by TVA.  Our examination objective was to determine if the company’s cost proposal was fairly stated for a contract with expenditures up to $175 million.

Other

TVA Transmission Network Cybersecurity

Report Number
2024-17523

The Office of the Inspector General performed an audit of TVA’s transmission network cybersecurity.  The audit scope was limited to a specific type of connectivity within TVA’s transmission network.  The audit objective was to determine the level of cybersecurity in place for this type of connectivity.

Audit

Cumberland Combined Cycle Transmission Project

Report Number
2024-17505

In January 2023, the Tennessee Valley Authority (TVA) issued a record of decision to retire and demolish its Cumberland Fossil Plant and replace one of its two units with a natural gas plant.  Subsequently, TVA implemented the Cumberland Energy Solution (CES) project to construct a 1,450-megawatt natural gas-fueled combined cycle (CC) plant.

Inspection / Evaluation

TVA Transmission Capacity

Report Number
2024-17510

The Tennessee Valley Authority's (TVA) transmission planning process includes assessing the capacity of the transmission system to reliably deliver power from generation resources to customer loads.  Due to the importance of ensuring TVA’s transmission system can accommodate its generation strategy and ensure adequate system margins to allow for reliable customer supply, we performed an evaluation to determine if TVA’s plans for transmission capacity support (1) planned generation additions and (2) demand growth.

Inspection / Evaluation

General Ledger Modernization

Report Number
2024-17485

The Tennessee Valley Authority’s (TVA) 5-year Enterprise Technology Plan seeks to transform the way TVA does business through technology and digital innovation.  Digital Finance is one of seven efforts within this multi-year initiative, aimed at modernizing and streamlining TVA’s financial systems and processes.  Modernization of the general ledger (GL) is the first step within Digital Finance. The objectives of the GL Modernization project include implementing an enterprise financial management system with minimal customization, redefining and modernizing TVA’s chart o

Inspection / Evaluation

TVA One Card

Report Number
2024-17501

The Tennessee Valley Authority (TVA) provides credit cards, known as the TVA One Card, to its employees to make purchases for TVA business, such as materials and supplies, travel, meetings and events, fuel for rental vehicles, management expenses, and services.  TVA transitioned from separate corporate credit cards and purchasing cards to the TVA One Card in 2022 and implemented a new expense management system.  For the 12-month period of May 1, 2023, through April 30, 2024, purchases made on the TVA One Card totaled $86.6 million.

Audit