We determined:The PRIS backup failure was due to (1)human error and (2)the lack of proper controls which would have detected PRIS was no longer on the master backup schedule which resulted in not having backups performed for PRIS.The PRIS server failure was due to hardware failures and the impact was magnified by human error.The Performance Review & Development data was not adequately secured when regenerated in recovery efforts.TVA management agreed with the findings and has taken or is taking corrective action.
Joint Report
Yes
Participating OIG
Tennessee Valley Authority OIG
Agency Wide
Yes (agency-wide)
Questioned Costs
$0
Funds for Better Use
$0